Заказчик | Объект | Работа | Фотографии |
---|---|---|---|
АО "Богучаннефть", г. Богучаны | Low-Capacity Refinery |
Detail engineering for 50,000 t/yr refinery. |
|
АО "Каустик", г. Стерлитамак | Dichlorethane Unit as part of Vinylchloride Plant |
Outline of design basis to develop engineering for dichlorethane unit as part of vinylchloride plant based on high-temperature liquid-phase direct chlorinaton. |
|
ВНИИНефтемаш, г. Москва | AVT-5 Unit |
Development of main process approaches for revamp of AVT-5 Unit at Volgograd Refinery to produce narrow-cut lube oil fractions of preset quality. |
|
ПО "Кыргызнефть" г. Кочкор-Ата, Киргизия | Low-Capacity Refinery |
Outline of design basis, detail design, manufacture, supply, erection and commissioning of 100,000 t/yr refinery. |
|
ООО "Нефтехиммаш-Инжиниринг Лтд.", г. Москва | 220-50 Unit for close-cut oil fractions, PO "NAFTAN" |
Development of recommendations on upgrade of vacuum unit to produce narrow-cut lube oil fractions of preset quality. |
|
ПО "Химволокно" г. Красноярск | VVU20 Unit |
Process calculation of AI2 evaporator integrated into VVU20 Unit to verify unit operation under new conditions. |
|
ПО "Химволокно" г. Красноярск | Sodium Sulphate Crystallization, Dehydration and Drying Unit |
Outline of design basis for revamp of mirabilyte crystallization section of complete sodium sulphate crystallization, dehydration and drying unit |
|